• Archived Posts

    • Archived Newspapers

  • Subscribe
  • Contact Us
  • DONATE

Select Page

Marine Way Underpass Project at the Great Park

by ICNV Staff

Image rendering obtained from the City’s website

With so many new amenities coming to the Great Park, the City is working to improve access and traffic circulation into and around the park.

A portion of Marine Way runs along the southern perimeter of the Great Park, north of the Metrolink railway. However, there is currently no direct rail crossing or direct road access into the Great Park from Marine Way and Barranca, where Marine Way now ends. To address that problem, construction is now underway to create a new rail undercrossing at Marine Way to provide a direct connection between the Great Park and the Spectrum area. (The nearest crossings are currently located 2.5 miles northwest at Sand Canyon Avenue, and about 2 miles southeast at Alton Parkway.)

The Marine Way extension and new underpass will reduce travel times, ease congestion, and save drivers fuel. By prioritizing safety and creating these new connections, the City hopes to make it easier for residents to walk or bike, resulting in fewer vehicle trips and lower greenhouse gas emissions.

Construction is scheduled to be completed in the second half of 2027. We’ll keep you posted on the progress of this remarkable infrastructure project.

ICNV Staff

LATEST WEATHER

Irvine, CA
54°
Cloudy
5 am6 am7 am8 am9 am
54°F
54°F
52°F
54°F
57°F

Follow Us

Advertisement

Jason Tu Mobile Service iOS and Android Repair 949.385.1744
Skip to content